How We Engineer

Standards-based analysis, rigorous QA, comprehensive documentation

How AES scopes, documents, and reviews electrical engineering work from kickoff to issue.

Engineering Philosophy

The principles we engineer by

How we document decisions, assign responsibilities, and consider how facilities operate.

Principle 01

Defensible Engineering

Document the engineering methods, key inputs, assumptions, and limits behind findings and recommendations.

Principle 02

Risk & Responsibility

Identify the responsible engineer and agree on who coordinates with the owner, utility, and authority having jurisdiction.

Principle 03

Lifecycle Thinking

Consider expected operating conditions, future loads, maintainability, and maintenance requirements where relevant to the scope.

Standards & Compliance

Grounded in the codes that matter

Requirements depend on jurisdiction, facility, equipment, and scope. These references are examples.

Codes and Standards
  • NFPA 70 (NEC)
  • NFPA 70B
  • NFPA 70E
  • IEEE 1584
  • ANSI/IEEE C37 Series
Authority & Coordination
  • AHJ Coordination
  • Utility Interconnection
  • State / Municipal Amendments
  • Facility-Specific Standards
Quality Assurance

Review before issue

Review and sealing requirements are established for each engagement.

1

Technical Review

Check inputs, assumptions, methods, and deliverables. Assign independent review when required by the applicable rules, contract, or agreed scope.

2

Applicable Requirements

Identify the governing standards and editions, jurisdictional requirements, and owner criteria for the specific work.

3

Constructability Review

Where the scope calls for it, assess installation constraints, coordination with other trades, and maintainability.

Engineer reviewing facility blueprints
Deliverables & Communication

Documentation that lasts

Deliverables reflect the agreed scope, findings, assumptions, and limitations.

  • Study reports, sealed when required and permitted
  • Single-Line & System Diagrams
  • Equipment Specifications
  • Compliance & Label Documentation
Project Phases

From scope to issue

The schedule is agreed for each project based on scope, records, site access, and review requirements.

  1. 1

    Project Initiation

    Confirm scope, engineering responsibility, authorization, and the inputs needed.

  2. 2

    Information Gathering

    Review available drawings, equipment records, and utility data. Define field verification and access where needed.

  3. 3

    Analysis & Engineering

    Check inputs, perform the agreed analysis, and document assumptions and limitations.

  4. 4

    Deliverable Preparation

    Prepare the agreed reports, drawings, or label schedules and complete the applicable reviews.

  5. 5

    Client Review & Finalization

    Address agreed comments and issue deliverables after the required review and authorization.